What is the best stage of termites treatment.
some step to reduce and kill termites colonies.
Pre- construction the chemical emulsion shall be applied uniformly at the
prescribed rate in the all stages of treatment.Hand operated sprayer or watering
can should be used for application of chemical emulsion.
Treatment of masonry foundation.
- Bottom surface and side of foundation pit up to a height of 30 cm should be treatedchemical emulsion per square meter of surface area.
- Back fill Earth in immediate contact with the foundation structures should be treated7.5 per square meter of the vertical surface of the substructure for each side
- treatment of RCC foundations treatment should start at a depth of 50 M belowground level with 7.5 per square meter
- treatment of top of Finland feelings the top surface of the current consolidatedare within plinth wall shelf be treated which chemical mission @ five little school of
- The Heritage before the sand bad for sub grade of laid.
- soil treatment along external diameter of buildings along the externalwalls of the building should be rotated at intervals of 15 cm and to a depth of 30 cm
- exposing the foundation wall surface. chemical solution should be poured along
- the walls with 7.5 per square meter of vertical surface.
- Treatment of soil under apron along the external perimeter of buildings surface tothe earth over which the apron is to be laid shall be treated with chemical solution
- per square mete the vertical surface
post Constructions
- Soil treatment along external perimeter of building should be loaded at gift of 30 cmexposing the foundation chemical solution should be alone the world.
- treatment of swell under apron along external perimeter of building top surface
- of the earth over which one is LED shall be treated by drilling 30 cm apart and
- foreign the chemical solution 2.2 liter per linear meter
- treatment of soil under floor to prevent entry of termites from trackssoil under floor should be treated drill 12 mm holes at the junction of floor and
- wall at 30 cm to reach the swallow the chemical solution letter for whole and sale
- treatment of voids in masonry through masonry was restricted by drillingholes in Masonry wall at about a 45 degree angle reasonable from both sides
- of the plinth wall at 37 interval and script the chemical in wholes till refusal and
- seals the holes.
- treatment of upper floors in case of infestation in upper floors treat groundfloor of the existing building as described above
- equipment hand operated cancer spare foot sprayer recommended
Comments