What is the best stage of termites treatment.


Termites and their management a maleficence  science it is not an easy job there are
some step to reduce and kill termites colonies.

Pre- construction the chemical emulsion shall be applied uniformly at the
prescribed rate in the all stages of treatment.Hand operated  sprayer or watering
can should be used for application of chemical emulsion.
  Treatment of masonry foundation. 
  •  Bottom surface and side of foundation pit up to a height of 30 cm should be treated
    chemical emulsion per square meter of surface area.
  • Back fill Earth in immediate contact with the foundation structures should be treated
    7.5 per square meter of the vertical surface of the substructure for each side
  •  treatment of RCC foundations treatment should start at a depth of 50 M below
    ground level with 7.5 per square meter
  •  treatment of top of Finland feelings the top surface of the current consolidated
    are within plinth wall shelf be treated which chemical mission @ five little school of
  • The Heritage before the sand bad for sub grade of laid.
  •  soil treatment along external diameter of buildings along the external
    walls of the building should be rotated at intervals of 15 cm and to a depth of 30 cm
  • exposing the foundation wall surface. chemical solution should be poured along
  • the walls with 7.5 per square meter of vertical surface.
  • Treatment of soil under apron along the external perimeter of buildings  surface to
    the earth over which the apron is to be laid shall be treated with chemical solution
  • per square mete the vertical surface

 post Constructions

  • Soil treatment along external perimeter of building should be loaded at gift of 30 cm
    exposing the foundation chemical solution should be alone the world.
  • 5 per square meter of vertical surface.
  •   treatment of swell under apron along external perimeter of building top surface

  • of the earth over which one is LED shall be treated by drilling 30 cm apart and
  • foreign the chemical solution 2.2 liter per linear meter
  •  treatment of soil under floor to prevent entry of termites from tracks
    soil under floor should be treated drill 12 mm holes at the junction of floor and
  • wall at 30 cm to reach the swallow the chemical solution letter for whole and sale
  •  treatment of voids in masonry  through masonry was restricted by drilling
    holes in Masonry wall at about a 45 degree angle reasonable from both sides
  • of the plinth wall at 37 interval and script the chemical in wholes till refusal and
  • seals the holes.
  •  treatment of upper floors  in case of infestation in upper floors treat ground
    floor of the existing building as described above
  •  equipment hand operated cancer spare foot sprayer recommended